What a FedRAMP audit costs
Nobody can give you an exact price, because no 3PAO publishes one. This guide is the next best thing: every fee line, broken out by level and phase, with the disagreements between sources shown rather than smoothed over, and the parts of the bill nobody ranges at all called out as such.
Ranges compiled November 2026 from the industry sources listed at the bottom of this page. Last updated: 2026-11-22.
How to read this page. No 3PAO publishes a rate card. Every figure below is a compiled industry range from third-party sources: advisory firms, GRC vendors, and FedRAMP guides, not a quote from any assessor. The sources disagree at the edges; the consensus core is consistent, and where one source diverges sharply we say so. Use these ranges to plan a budget and to judge whether a quote is in the expected band, then get quotes from assessors. FedRAMP 20x is also changing the cost picture, and its claimed savings rest on a single vendor source so far (see below).
At a glance
| Item | Low (Class B) | Moderate (Class C) | High (Class D) |
|---|---|---|---|
| 3PAO assessment fee | $75K–$150K | $150K–$400K | $400K–$800K |
| Total initial authorization | $250K–$500K | $500K–$1.5M | $1.5M–$3M+ |
| Total timeline | ~12–18 months | 12–24 months | 18–36 months |
| Annual continuous monitoring | $100K–$600K/year by level (commonly $200K–$500K for Moderate) | ||
Readiness assessment (RAR)
| Item | Cost | Duration |
|---|---|---|
| Readiness Assessment Report (RAR) by a 3PAO | $25K–$75K | 1–2 months |
The RAR is optional and available for Moderate and High only. A passing RAR earns the FedRAMP Ready designation, valid for one calendar year, and its main value is signaling to prospective agency sponsors. The readiness assessment page covers when it is worth the money and what it does not buy you.
The full 3PAO assessment fee
| Level | 3PAO assessment fee | Assessment phase duration |
|---|---|---|
| Low (Class B) | $75K–$150K | 2–4 months including remediation and retesting; the testing window is typically 6–12 weeks, and SAP to SAR often runs 8–16 weeks. |
| Moderate (Class C) | $150K–$400K (most commonly cited: $150K–$300K) | |
| High (Class D) | $400K–$800K |
This is the fee paid to the 3PAO for the assessment itself: developing the Security Assessment Plan, testing controls, interviews, vulnerability scanning, penetration testing, and producing the Security Assessment Report and POA&M. Some sources cite a wider band ($100K–$500K) for the assessment phase; the table above reflects the consensus core across sources.
One thing to confirm before signing: what the headline fee leaves out. Retesting after remediation, penetration testing, and assessor travel are not always included, and each retest cycle adds time and cost. Ask explicitly, in writing, before comparing quotes.
Total cost of an initial authorization
| Level | Total initial authorization (all-in) | Total timeline |
|---|---|---|
| Low (Class B) | $250K–$500K | ~12–18 months |
| Moderate (Class C) | $500K–$1.5M | 12–24 months |
| High (Class D) | $1.5M–$3M+ | 18–36 months |
What the all-in total includes
The assessment fee is roughly a quarter to a third of the all-in cost for a first authorization. The rest is everything around it:
| Component | What is known about the cost |
|---|---|
| 3PAO assessment fee | $75K–$800K by level; see the table above. |
| Advisory and consulting, full lifecycle | $100K–$500K (gap assessment, boundary and landing-zone design, SSP authorship, evidence preparation, remediation, sponsorship support). One source cites $250K–$750K for advisory on a Moderate engagement. |
| Federal landing zone and infrastructure | No published range. Building a dedicated federal environment, typically on FedRAMP-authorized IaaS such as AWS GovCloud or Azure Government, is often the single largest cost line outside the assessment itself, and it varies too widely with architecture to range responsibly. |
| GRC and compliance tooling | Vendor-published figures only, and they vary by vendor and tier: Paramify lists roughly $8,000–$60,000/year; Vanta pricing starts around $10,000–$12,000/year; Drata around $10,000+/year. Treat vendor pricing pages as the source, not this guide. |
| Remediation engineering | No published range. Depends on how many findings the assessment produces and how much engineering each one needs. |
| Internal staff time | No published range. A first authorization consumes months of engineering, security, and leadership time; budget it as real cost, not free effort. |
Where sources diverge. One source (TechVendorIndex) puts first-time Moderate costs at $1.5M–$5M and High at $3M–$8M when the landing zone is included, well above the consensus ranges above. Another source puts the total to first ATO at $750K–$2.5M. The gap mostly reflects what is counted: a CSP building a dedicated federal environment from scratch spends far more than one extending an existing compliant boundary. Budget to the high end of the consensus range if you are building the landing zone from nothing.
Annual continuous monitoring
| Item | Cost |
|---|---|
| Annual continuous monitoring (including the annual 3PAO reassessment, monthly reporting, and annual penetration testing) | $100K–$600K/year by level; commonly $200K–$500K/year for Moderate |
Authorization is not a one-time purchase. Monthly vulnerability scans, POA&M updates, and inventory reporting, plus the annual reassessment and penetration test, continue indefinitely. Budget the annual figure as a permanent operating cost, not a project cost. The continuous monitoring page covers what that money buys.
What drives the price up or down
- Level. The control count roughly triples from Low (about 125 controls) to Moderate (about 325) to High (about 421). More controls means more testing, more evidence, and more assessor hours. Control counts are approximate and vary by counting method.
- Boundary size and complexity. A narrow, well-defined federal environment costs less to assess than a sprawling system with many integrations, external services, and data flows. Boundary decisions made early echo through every later phase.
- Readiness. A CSP that arrives with controls already implemented, evidence organized, and an SSP in good shape spends less on remediation and retesting. Remediation is the phase where budgets most often blow out.
- Landing zone. Building a dedicated federal environment is often the single largest cost line outside the assessment itself. Extending an existing compliant boundary is much cheaper than building one from nothing.
- Findings. High and Critical findings must be remediated and retested before authorization. Each retest cycle adds time and cost, and a finding that requires re-architecture costs far more than one fixed with a configuration change.
- Penetration testing. Required for Moderate and High (not Low or LI-SaaS), at least every 12 months, with the initial test no more than 6 months before SAR submission. Confirm whether it is inside the assessor's headline fee or billed separately.
FedRAMP 20x: claimed savings, thin evidence
FedRAMP 20x is designed to cut cost and time through automation: machine-validated Key Security Indicators instead of narrative documentation, and no sponsor required at the low end. One vendor guide (platform28) claims a 20x authorization costs $145K–$360K total and takes weeks to about 6 months, versus $500K–$2M+ on the traditional path.
Single-source claim. The $145K–$360K figure comes from one vendor source and has no independent confirmation. Treat it as marketing-grade until more evidence appears. This site will update the 20x cost picture as verified figures emerge.
How to read a quote
Assessors price on scope: boundary, control count, readiness. A quote for your system is the only number that matters, and the ranges on this page exist to judge whether a quote sits in the expected band. Before comparing quotes, get the same answers from each assessor:
- What is included? Retesting, penetration testing, and travel are not always in the headline fee. A low quote that excludes retesting can end up the expensive one.
- How is retesting handled? How many retest cycles are included, and what does an additional cycle cost?
- What timeline is assumed? A quote that assumes a 6-week testing window and a quote that assumes 12 weeks are not the same engagement.
- What does the assessor need from you? Evidence preparation, interview scheduling, and environment access all consume your team's time. Ask what the assessor expects and when.
- Who is on the team? Assessor experience matters more than firm size. The team that shows up is the engagement.
And budget in the right order: start with the total, not the assessment fee; price the advisor separately (advisory is a separate engagement with a separate firm, by rule); and budget the annual monitoring figure from day one, as a permanent operating cost.
Sources for the ranges
- AuditXYZ, FedRAMP authorization process and framework pages — auditxyz.com
- Drata, FedRAMP overview — drata.com
- Diogenes Club, FedRAMP strategic guide for SaaS leaders — diogenesclub.ca
- TechVendorIndex, FedRAMP advisory — techvendorindex.com
- Qualysec, FedRAMP authorization — qualysec.com
- Luka GRC, FedRAMP glossary — lukagrc.com
- Platform28, FedRAMP 20x guide (single source for the 20x cost claim) — platform28.com
- GRC tooling figures are vendor-published: Paramify, Vanta, and Drata pricing pages, as compiled in the research behind this site.
Frequently asked questions
Why doesn't anyone publish 3PAO prices?
Assessors price engagements on scope: the size of the authorization boundary, the number of controls, the CSP's readiness, and the amount of retesting needed. A flat rate card would mislead more than it helps. The result is that all public cost figures are third-party ranges compiled from advisory firms, vendors, and guides.
Is the 3PAO fee the biggest cost?
No. For a first authorization, the assessment fee is typically a quarter to a third of the all-in cost. The federal landing zone, advisory support, remediation engineering, and internal staff time usually cost more in total.
How much does it cost to stay authorized?
Roughly $100K–$600K per year depending on level, commonly $200K–$500K for Moderate, covering monthly continuous monitoring deliverables, the annual 3PAO reassessment, and annual penetration testing.
Costs make more sense once you know the sequence. The process page walks through the phases, and the readiness assessment page covers the optional first step.